Girder Bridge

Girder Bridge

Girder Bridge Commissioning with 375MT Stator

Home News Girder Bridge Commissioning with 375MT Stator

375 mt Stator Girder Bridge

project overview

Successful commissioning of RuiQianHe 400MT High Girder Bridge in India. The Girder Bridge operated with high customer satisfaction across 1500km of challending terrain. 

Cargo                    :               800MW Generator Stator

Client                     :               BGR Energy Systems

From                      :               Raipur, India

To                           :              Mumbai Port, India

Cargo Weight        :               375MT

Cargo Length         :               13.5m

Cargo Width           :               5.4m

Cargo Height          :               5.5m

    Share: